Contract Clinic

RUSHD Contract Clinic

Contract Clinic: From an Open-Ended Clause to a Controllable, Evidentiary Mechanism

Controlling Variations

Do Not Let Additional Work Precede the Authority to Approve It

The issue is not the change itself, but who requested it, when it was approved, and how its impact on price and time was assessed.

High Claims Exposure
Risky wordingHigh-Risk Drafting
The contractor may execute any additional works it considers necessary to complete the works and shall be entitled to the value of such works at actual cost plus the agreed percentage.
§
Why the Difference Matters

Controlled drafting does not prevent change; it prevents operational communication or field instructions from becoming unauthorized financial commitments. Connecting authority, writing, valuation and record reduces the scope for disputes over entitlement, quantum and time.

ألغاز رُشد

نبض الإدارة
ملخص القيادة القانوني · أغسطس 2026

ما الذي يجب أن تعرفه القيادة الآن؟

قراءة تنفيذية مركزة من محتوى هذا العدد: أعلى الإشارات التنظيمية، المخاطر التي تستحق الانتباه، والقرارات العملية التي تحول الرصد القانوني إلى فعل مؤسسي.

مدة القراءة · 3 دقائقالعدد 01
01 · التطورات5 تطورات يجب معرفتها
من الرادار القانوني
02 · المخاطر5 مخاطر تستحق انتباه القيادة
الرادار + قضية العدد
03 · الإجراءات5 قرارات / إجراءات مطلوبة
الأثر على مرافق
عندك سؤال لي؟ اسألني مباشرة 👋
عندك سؤال قانوني أو حوكمي؟ اسألني 👋